Projects

ALIT’s projects cover the design, construction and modernization of process installations and industrial facilities for the cement, lime and power industries. This selection includes material transport and storage installations, silos, structural steelwork, dedusting systems and environmental protection solutions.

2020–present

Preliminary Feasibility Study for CO2 Capture and Preparation for Transport
for: Cementownia Warta SA
Alternative fuel drying installation
for: Cementownia Warta SA
Clinker silo no. 2 with backfilling and discharging systems
for: Cementownia Warta SA
Gypsum dosing system in Gdynia milling plant
for: CEMEX
Cable gallery “BGP” Polkowice at KHGM Polska Miedź S.A.
for: MOSTOSTAL Kraków
Concept of an industrial installation for the process of obtaining a binder from fine-grained carbonate mineral waste, as part of the Project entitled “Comprehensive technology for the management of the carbonate part of flotation waste from the current production of KGHM and the production of innovative materials for the industry.
for: ICiMB Łukasiewicz
New chimney in Chełm cement plant
for: CEMEX
Project to strengthen existing cement silos
for: CEMEX
Installation of mixing new products pn. „Green Solution – mixing station”
for: Cement Ożarów S.A.
Feasibility study for the construction of a cement plant in Bełchatów complex
for: PGE S.A.
Installation of a grinding press returning from the dryer-crusher separator – concept
for: CEMEX
Slag drying installation – concept
for: CEMEX
Modernization of dedusting of clinker silos
for: CEMEX
Lafarge Cement Kujawy a line of cement mixes
for: MOSTOSTAL Kraków
Roll Press
for: Górażdże Cement
Municipal waste recycling center MPO Kraków
for: NDI Group
Engineering suport for ESP CERADO – BRAZYLIA
for: ANDRITZ AG S.A.
Installation of dosing lime ashes to raw material mills – concept
for: Cement Ożarów S.A.
Chromium reducer dosing installation
for: Cement Ożarów S.A.
By-Pass installations
for: Cementownia Odra S.A.
Raw dryer installations in Rudniki Cement Plant
for: CEMEX
Biofiltr installations
for: Górażdże Cement
Expansion of the clinker production line with a thermal waste treatment system in the Chelm cement plant
for: Energa Slezko
Hall P 21 in the KGHM with a surface area of 11,500 m2
for: MOSTOSTAL Kraków

2010–2019

Hall P 31 in the KGHM with a surface area of 4,500 m2
for: MOSTOSTAL Kraków
Modernisation of Wet Flue Gas Desulphurization Installation in the Bełchatów power plant
for: RAFAKO S.A.
Modernisation of the electrostatics in the Polaniec power plant
for: General Electric
Modernization of Battery 4 in the Przyjazn Coking plant
for: Koksoprojekt
Wet Flue Gas Desulphurization Installation in the Ostroleka Power plant
for: RAFAKO S.A.
Expansion of the limestone mill in the Belchatow power plant
for: RAFAKO S.A.
Modernization of the dust removal system for clinker transport
for: Cementownia Górażdże
Improving the quality of cement in the Kujawy Cement Plant
for: Lafarge Cementownia Kujawy
Flue Gas Desulphurization Installation IN Iternational Paper Kwidzyn – Semi-dry method
for: Rafako
Kiln modernisation in Rudniki Cement Plant
for: Cemex
Power Plant Zabrze dust and air ducts
for: AMEC Foster Wheeler
Installation of exhaust gas desulphurization in VKG Energia Estonia
for: AMK Kraków
Change of electric filters to bag dedusters
for: Grupa Ożarów
Alternative fuels’ drying installation in Rudniki Cement Plant
for: Cemex
ZA Kędzierzyn – flue gas desulphurization
for: Rafako
3000 ton ash silo with pneumatic transport
for: Warta Cement Plant
Development of coal mill – Feasibility study
for: Cemex
Alternative fuels’ drying installation in Rudniki Cement Plant – Feasibility study
for: Cemex
Stabilizer of coke
for: Radlin Coking Plant
120 000 ton clinker silo
for: Warta Cement Plant
SNCR installation in Chełm Cement Plant
for: Cemex
Alternative fuels’ dryer installation
for: LAFARGE Kujawy Cement Plant
Feasibility study for Cement Plant Rudniki modernization
for: CEMEX
RDF storage and combustion installation (hot disc)
for: LAFARGE Kujawy Cement Plant
Specodlew Company objects in Skawina
for: AWBUD
Alternative fuels’ dryer installation
for: LAFARGE Małogoszcz Cement Plant
SNCR Installation
for: LAFARGE Małogoszcz Cement Plant
Installation of exhaust gas desulphurization Tripolska Ukraine – semi – dry method
for: RAFAKO
Cement transport from mill no 4
for: Górażdże Cement Plant
Building Permit Project for Installation of compost purification production line
for: MZO Pruszków
Kozienice IV Power Plant – installation of exhaust gas desulphurization – exhaust ducts
for: INSTAL Kraków
Installation of alternative fuels’ drying in Rudniki Cement Plant
for: Cemex
Installation of alternative fuels’ drying in Rudniki Cement Plant
for: Grupa Ożarów
Dehydratation for mining excavation works
for: Dolomit Mine Libiąż
Chamber for mixing gas from suspension furnance
for: BIPROMET
Demolishing permit project in Chełm II
for: Cemex
Modernization of fuels’ dosing installation in Małogoszcz Cement Plant
for: Lafarge Cement
Development of cement silos 2 x 500 m3 in Kujawy Cement Plant
for: Lafarge Cement
Storage and transport of bypass dust in Warta Cement Plant
for: Warta Cement Plant
Modernisation of coke battery no 3 and 4 – coal route
for: Coking Plant “Przyjaźń
Terminal of bulk cement loading in Górażdże Cement Plant
for: Górażdże Cement Plant
Fly ash transport in Warta I
for: Warta Cement Plant
Instalation of storage and transport of fly ash and sorbent in Bielsko Biała Power Plant
for: Tauron/Energoprojekt Katowice
Instalation of storage and transport of fly ash in Jaworzno Power Plant
for: Tauron/Instal
System of fly ash dosing to cement mills no 4 ÷ 7 in Warta I
for: Warta Cement Plant
Instalation of by-pass dust transport and dosing
for: Warta Cement Plant
Instalation of bottom and fly ash transport and storage  in Jaworzno Power Plant
for: Tauron
Instalation of dust and sorbent transport and storage in Bielsko-Biała Power Plant
for: Tauron
Installation of bulk cement loading in Górażdże Cement Plant
for: Górażdże Cement Plant
Alternative fuel drying installation
for: Cemex Sp. Z o.o.
Transport and storage of bypass dust in Ozarow Cement Plant
for: Ozarow Group S.A.
Installation for burning of biological mass in Turow Power Plant
for: MontoremSA
Steel structures for installation of exhaust gas desulphurization – blocks 1 and 2 in Belchatow Power Plant (on course)
for: Rafako S.A.
Glassworks in Iran and Brasil – Execution Documentation
for: Lahti Precision
Fly ash transport and storage in Małogoszcz Cement Plant
for: LAFARGE CEMENT S.A.
Małogoszcz Cement Plant
Clinker silos of 120.000 m3 and 2 x 60.000 m3 – Conception Project
for: Warta S.A.
Dehydration of dolomite deposites
for: Tribag
Poultry slaughter plant in Kaleń
for: Drob – Bogs
Installation of alternative fuels
for: Ozarow Group S.A.
Installation of by-pass from furnace W1
for: Ozarow Group S.A.
Modernisation of Sorting Department no 2
for: Limestone Mine Czatkowice
Modernisation of Electrofilter of block no 10
in Kozienice Power Plant

for: Rafako S.A.

2000–2009

Installation of Alternative Liquid Fuels (key-turn realisation)
for: Cemex Ltd.
Installation of by-passs dust dosing in Kujawy Cement Plant
for: Lafarge Cement S.A.
Installation of pneumatic fly ash conveying in Kujawy Cement Plant
for: Lafarge Cement S.A.
Nostrification of the MMP Ireland documentation for Raw Material Mill and Coal Mill in Ozarow Cement Plant
for: Ozarow Group S.A.
Inlet and outlet flu gas ducts from hot gas precipitator in Boxberg Power Plant Germany.
for: Rafako S.A.
Installation for burning biological mass in Siekierki Power Plant
for: Vattenfall Polska S.A.
Pneumatic Cement transport line
for: LAFARGE CEMENT S.A.
Kujawy Cement Plant
Building permit changing project for fermentation tanks station in Okocim Brewery
for: Carlsberg Poland S.A.
Development of the second drying crusher
for: Cemex Ltd.
Development of the industrial plant
for: Beton Bytom Ltd.
Cement packaging and paletization line
for: LAFARGE CEMENT S.A.
Kujawy Cement Plant
Logistics Centre in Mielec
for: Capital Investments’ Office
Documentation of gas generators
for: Unitherm Cemcon
Clinker silos of 2 x 125.000 tons with clinker transport to mill building
for: Cemex Ltd.
Chełm Cement Plant
Clinker silo of 130 thousand tones with clinker transport to mill building
for: Ożarów Group S.A.
Development of new cement mill
for: LAFARGE CEMENT
Kujawy Cement Plant
Geological and topographical documentation for future investments
for: Cemex Ltd.
Chełm and Rudniki
Cement Plants
Documentation of bulk cement loading station
for: Cemex Ltd.
Building of by-pass ash silos and ash transport line
for: LAFARGE CEMENT
Małogoszcz Cement Plant
Installation of bulk cement loading
for: Cemex Ltd.
Ash silo of 3000 tons with pneumatic conveying
for: Warta S.A.
Clinker silos of 120.00 tons
for: LAFARGE CEMENT
Kujawy and Małogoszcz Cement Plants
Installation of transportation and dosing of lime meal
for: Lafarge Cement S.A.
Małogoszcz Cement Plant
Building Permit and Execution Project for Cement G40 new packing line in Górka Cement Plant
for: Górka Cement Ltd.
Building Permit and Execution Project of printing cylinders assembly line
for: Kęty Group S.A.
Concept project of cargo gantry with infrastructure                in Kęty Group – Building Permit and Execution Project
for: Kęty Group S.A.
Building Permit and Execution Project of the storage hall BODEKO in Zawiercie
for: Awbud S.A.
Building Permit and Execution Project of alternative fuel installation in Chełm Cement Plant
for: Cemex Ltd.
Building of 7 – colour rotogravure printer. Building Permit and Execution Project
for: Alupol Ltd.
Workshop drawings for new Electrostatic Precipitator            Stambolijski in Bulgaria
for: Elwo S.A.
Building Permit and Execution Projects of flue gas desulphurization in Skawina Power Plant
for: Rafako S.A.
Building Permit and Execution Project for TIR carpark and road modernization in Górka Cement Plant
for: Górka Cement Ltd.
Technical documentation of overhauling of Transportation Workshop in Kęty Group
for: Kęty Group S.A.
Concept Project of road connection system in Kęty Group
for: Kęty Group S.A.
Building Permit and Execution Project of flue gas by-pass from rotary kiln in Kujawy and Małogoszcz Cement Plants
for: Lafarge Cement S.A.
Building Concept Project, Building Permit and Execution Project of halls with 11.000 m2 of social and office surface and 8.500 m2 of road connection system
for: Kęty Group S.A.
Building Permit and Execution Project of thermal insulation of production halls
for: Philip Morris Poland S.A.
Concept Project of new factory for Vistula Company
for: Vistula S.A.
Fly ash silo 3000 t in Lafarge Kujawy Cement Plant
for: Lafarge Cement Polska S.A.
Cement loading station project in Chelm Cement Plant
for: MJM Ltd.
Multitask project of Desulphurization Installation in Łodz Power Plant
for: Rafako S.A.
Multitask concept project of road connection of Carlsberg Brewery with national domestic roads.
for: Carlsberg Poland
Designing services for investments and overhauling
for: Philip Morris Poland
Building Permit and Multitask project for reinforcement steel production hall in CMC Zawiercie Ironworks.
for: Awbud Ltd.
Building Permit and Multitask project for fermentation tanks station in Okocim Brewery
for: Carlsberg Poland
Workshop drawings for coke transport way to in Coke Plant Zdzieszowice
for: Coke Designing Office Koksoprojekt Ltd
Workshop drawings for Raw Mill ESP, Clinker Cooler ESP and Conditioning Tower in Cam Pha Vietnam Cement Plant
for: Lurgi Bischoff
Multitask project for Storage Tanks Hall and raw materials dosing with building permit project
for: Glass Works Krosno
Multitask project for bolt storage hall In Bolt Factory In Lancut
for: Bolt Factory „Śrubex” S.A.
Workshop drawings for coal transport way to Coal Tower 1008 M in Coking Plant in Zdzieszowice
for: Coke Designing Office Koksoprojekt Ltd
Workshop drawings of ESP and flue gas ducts in Tuzla Bosnia Power Plant
for: Elwo S.A.
Feasibility study of energetic agents economy in Korona Ltd Factory
for: “Korona” Ltd
Multitask project of beer production hall in Okocim Brewery
for: Carlsberg Poland S.A.
Modernization of KOCH pipe conveyor with belt replacing in Malogoszcz Cement Plant
for: Lafarge Małogoszcz
Cement Plant S.A.
Workshop drawings of ESP in WSK Rzeszów Power Station
for: Elwo S.A.
Documentation for second stand of cement loading for tank car in Cement Plant Chelm
for: Cement Plant Chełm
Multitask project for modernization of solid waste storage with building permit project
for: Mittal Steel Poland Ltd
Modernization of raw materials dosing line in Malogoszcz Cement Plant (turn-key project).
for: Lafarge Cement Polska.
Multitask project for petrochemical waste storage, handling and dosing
for: Cement Plant Chełm
Workshop drawings of ESP for SLECO Belgium
Hot and cold roof
Support structure for HV rectifiers.

for: Elwo S.A.
Surface active components dosing system to cement mills in Ekocem Ltd.
for: Ekocem Ltd
Sulphate transport line and dosing installation to cement packed into the paper bags in Rudniki Cement Plant.
for: RMC Polska Ltd
Sulphate transport line and dosing installation to cement packed into the paper bags in Chełm Cement Plant.
for: RMC Polska Ltd
Workshop drawings of Electrostatic Precipitator no 2 in Power Plant Tent-Obrenovac Serbia.
for: Elwo S.A.
Multitask project of supermarket building with underground car parking in Krakow, Zakopianska street.
for: WP Inwestment Ltd
Multitask project of dedusting installation from rotary kiln no 3 and 4 in “Górka Cement” in Trzebinia.
for: Elwo S.A.
HVAC project for paper machine no 3 building and paper storage building in Klucze Paper Plant.
for: Kimberly Clark S.A.
Multitask project of gravel mine “RUDA”.
for: Górażdże Kruszywa
Opolskie Kopalnie Surowców Mineralnych
Project of closed circuit kiln and cement mill cooling water
for: Chełm Bałtyk Cement
Feasibility study modernization of Nordkalk Plant in Wolica. Modernization of railway station in Wolica.
for: Nordkalk Ltd
Workshop drawings of Electrostatic Precipitator no 5 in Power Plant Tent-Obrenovac Serbia.
for: Elwo S.A.
Civil engineering design and Workshop drawings for clinker handling from kiln no 3 and 4, clinker pouring junction, conveyor support steel structure.
for: Górka Cement Ltd
Workshop drawings for modernization of ESP no 5 in Kozienice Power Plant
for: Alstom Power
Pneumatic transport line of lime to silo no 4 (turn-key project).
for: Lhoist Bukowa Ltd
Workshop drawings of Electrostatic Precipitator and steel structures for Power Plant Pernik, Bulgaria.
for: Elwo S.A.
Multitask project for porter’s lodge, car parking, fence and main gate to Cement Plant.
for: Górka Cement Ltd
Trzebinia
Modernization of cement G70 loading station.
for: Górka Cement Ltd
Trzebinia
Workshop drawing of flue gas ducts, steel structures and stack for “Kuehlerenstaubung Sintranlage” Duisburg Germany.
for: Elwo S.A.
Design and Workshop drawings of cement packing and palletizing line transfer from CSO to Ekocem.
for: Ekocem Ltd
Trzebinia Refinery
Civil engineering for fuel organic components installation.

for: Eco – Invest Ltd
Workshop drawings of Plant industrial water piping.
Preliminary design and Workshop drawings for ash collection and handling from kiln exhaust gas chamber.
Civil engineering design and Workshop drawings –“Modernization of clinker pouring junction”.
Crushing machine development on clinker line to storage.

for: Górka Cement Ltd
Trzebinia
Workshop drawings for Hot Gas Generators No 1 & No 2 for Lafarge Beocin in Yugoslavia.
for: UnitermCemcon
Austria
Multitask project for storage-production building 13.000 sq.m. in Klucze Paper Factory
for: Kimberly-Clark S.A.
Workshop drawings for Electrostatic Precipitator – casing, roof, inlet & outlet nozzles, hoppers, stairs & platforms
for: Power Plant in Legnica
Modernization of Electrostatic Precipitator – civil works
for: Power Plant in Kawęczyn
Modernisation of Electrostatic Precipitator – project of civil works, flue gas ducts.
for: Power Plant in WSK Rzeszów
Multitask project for petrochemical waste storage,
handling and dosing

for: Lafarge Malogoszcz
Cement Plant S.A.
Engineering of 2 storage silos of 2100 m3 each, for Lodz Power Plant
for: Boilers Factory
Rafako S.A.
Modernization of Cement Mills no 1 and 2 (turn-key project)
for: Lafarge Cement S.A.
Transport and dosing system of alternative fuels PASi and PASr (feeding to kiln 1 and 2)
for: Lafarge Cement S.A.
Ash storage silo in IP Kwidzyn with a capacity of 2000 m3
for: Alstom Power Sp. z o.o.
Modernization of the dedusting installation of kiln no. 1 and clinker cooler in Cementownia Małogoszcz
for: Lafarge Cement
Polska S.A.
Cementownia Małogoszcz
New clinker production line with a capacity of 4,500 t/d in Bielawy – Preheater tower at the Lafarge Kujawy Cement Plant (the highest tower in Poland – 135 m)
for: Lafarge Cement Polska S.A. Kujawy
Modernization of the Plant Stage I: Screener replacement project
for: Nordkalk Miedzianka S.A.
Modernization of transport and dosing of ash to cement mill No. 1 in Górażdże Cement Plant
for: Górażdże Cement S.A.
Intermediate tanks for additives for cement mills no. 3 and 4 in the “Małogoszcz” Cement Plant (capacity 2 x 100 m3)
for: Cementownia
Lafarge Małogoszcz
Modernization of the dedusting installation for pig iron mixers no. 3 and 4
for: Huta im. Tadeusza Sendzimira
Shopping Center in Przemyśl and Świętochłowice
for: Echo Investment S.A.
Modernization of the electrostatic precipitator for boiler no. 2
for: Huta im. Tadeusza Sendzimira
Modernisation of Cement Grinding Line No 3 at Lafarge Cement Plant .
for: PSP Engineering a.s Prerov
Modernisation of packing and palletising line.
for: Lafarge Kujawy
Cement Plant S.A.
Feasibility study of cement transport modernisation:
to the silo under the silo

for: Lafarge Kujawy
Cement Plant S.A.
Design of conveyor system for cardboard / gypsum plates
for: Lafarge Nida Gips

1990–1999

Modernisation of preheater tower no 3 at Małogoszcz Cement Plant.
for: Lafarge Małogoszcz
Cement Plant S.A.
Modernisation of clinker transport system to the storage point in Małogoszcz Cement Plant.
for: Lafarge Małogoszcz
Cement Plant S.A.
Synthetic gypsum calcination installation, plaster mixture, repair gypsum and gypsum glue production
for: P.P.U.B. „AREL-Gips” Bełchatów S.A.
Rea- gypsum tanks – limestone transport.
for: Górażdże Cement S.A.
Modernisation of clinker transport from coolers.
for: Nowiny Cement Plant
Modernisation of Czatkowice Limestone Plant – objective: the reduction of noise emission. Solving the problem of dedusting at the crane – operated depot – modernisation of spraying system at discharge points.
for: Limestone Mine „Czatkowice” Ltd.
Siersza Power Plant – Flue Gas Desulphurisation (FGD):
sorbent carrier and truck unloading station
sorbent storage silo (2×1000 t)
pneumatic handling of sorbent to the slurry preparation station

for: Rafako S.A.
Steinmüller – Germany