References
RECENTLY WE DESIGNED
INVESTOR | YEAR | PROJECT |
---|---|---|
Cementownia Warta SA | currently | Preliminary Feasibility Study for CO2 Capture and Preparation for Transport |
Cementownia Warta SA | currently | Alternative fuel drying installation |
Cementownia Warta SA | currently | Clinker silo no. 2 with backfilling and discharging systems |
CEMEX | currently | Gypsum dosing system in Gdynia milling plant |
MOSTOSTAL Kraków | 2024 | Cable gallery "BGP" Polkowice at KHGM Polska Miedź S.A. |
ICiMB Łukasiewicz | 2023 | Concept of an industrial installation for the process of obtaining a binder from fine-grained carbonate mineral waste, as part of the Project entitled "Comprehensive technology for the management of the carbonate part of flotation waste from the current production of KGHM and the production of innovative materials for the industry. |
CEMEX | 2023 | New chimney in Chełm cement plant |
CEMEX | 2023 | Project to strengthen existing cement silos |
Cement Ożarów S.A. | 2023 | Installation of mixing new products pn. „Green Solution – mixing station” |
PGE S.A. | 2022 | Feasibility study for the construction of a cement plant in Bełchatów complex |
CEMEX | 2022 | Installation of a grinding press returning from the dryer-crusher separator - concept |
CEMEX | 2022 | Slag drying installation - concept |
CEMEX | 2022 | Modernization of dedusting of clinker silos |
MOSTOSTAL Kraków | 2022 | Lafarge Cement Kujawy a line of cement mixes |
Górażdże Cement | 2022 | Roll Press |
NDI Group | 2022 | Municipal waste recycling center MPO Kraków |
ANDRITZ AG S.A. | 2022 | Engineering suport for ESP CERADO – BRAZYLIA |
Cement Ożarów S.A. | 2022 | Installation of dosing lime ashes to raw material mills – concept |
Cement Ożarów S.A. | 2022 | Chromium reducer dosing installation |
Cementownia Odra S.A. | 2022 | By-Pass installations |
CEMEX | 2021 | Raw dryer installations in Rudniki Cement Plant |
Górażdże Cement | 2021 | Biofiltr installations |
Energa Slezko | 2020 | Expansion of the clinker production line with a thermal waste treatment system in the Chelm cement plant |
MOSTOSTAL Kraków | 2020 | Hall P 21 in the KGHM with a surface area of 11,500 m2 |
MOSTOSTAL Kraków | 2019 | Hall P 31 in the KGHM with a surface area of 4,500 m2 |
RAFAKO S.A. | 2019 | Modernisation of Wet Flue Gas Desulphurization Installation in the Bełchatów power plant |
General Electric | 2019 | Modernisation of the electrostatics in the Polaniec power plant |
Koksoprojekt | 2018 | Modernization of Battery 4 in the Przyjazn Coking plant |
RAFAKO S.A. | 2018 | Wet Flue Gas Desulphurization Installation in the Ostroleka Power plant |
RAFAKO S.A. | 2018 | Expansion of the limestone mill in the Belchatow power plant |
Cementownia Górażdże | 2017 | Modernization of the dust removal system for clinker transport |
Lafarge Cementownia Kujawy | 2017 | Improving the quality of cement in the Kujawy Cement Plant |
Rafako | 2016 | Flue Gas Desulphurization Installation IN Iternational Paper Kwidzyn - Semi-dry method |
Cemex | 2015/16 | Kiln modernisation in Rudniki Cement Plant |
AMK Kraków | 2015 | Installation of exhaust gas desulphurization in VKG Energia Estonia |
Grupa Ożarów | 2015 | Change of electric filters to bag dedusters |
AMEC Foster Wheeler | 2015/16 | Power Plant Zabrze dust and air ducts |
Cemex | 2014 | Alternative fuels’ drying installation in Rudniki Cement Plant |
Rafako | 2014 | ZA Kędzierzyn – flue gas desulphurization |
Warta Cement Plant | 2014 | 3000 ton ash silo with pneumatic transport |
Warta Cement Plant | 2014/2015 | 120 000 ton clinker silo |
Cemex | 2014 | Development of coal mill - Feasibility study |
Cemex | 2014 | Alternative fuels’ drying installation in Rudniki Cement Plant - Feasibility study |
Radlin Coking Plant | 2014 | Stabilizer of coke |
Cemex | 2013 | SNCR installation in Chełm Cement Plant |
INSTAL Kraków | 2013 (still on) | Kozienice IV Power Plant - installation of exhaust gas desulphurization – exhaust ducts |
LAFARGE Kujawy Cement Plant | 2013 | Alternative fuels’ dryer installation |
CEMEX | 2013 | Feasibility study for Cement Plant Rudniki modernization |
LAFARGE Kujawy Cement Plant | 2013 | RDF storage and combustion installation (hot disc) |
AWBUD | 2013 | Specodlew Company objects in Skawina |
LAFARGE Małogoszcz Cement Plant | 2013 | Alternative fuels’ dryer installation |
LAFARGE Małogoszcz Cement Plant | 2013 | SNCR Installation |
RAFAKO | 2013 | Installation of exhaust gas desulphurization Tripolska Ukraine – semi – dry method |
Górażdże Cement Plant | 2013 | Cement transport from mill no 4 |
MZO Pruszków | 2013 | Building Permit Project for Installation of compost purification production line |
Cemex | 2012 | Installation of alternative fuels’ drying in Rudniki Cement Plant |
Grupa Ożarów | 2012 | Installation of alternative fuels’ drying in Rudniki Cement Plant |
Dolomit Mine Libiąż | 2012 | Dehydratation for mining excavation works |
BIPROMET | 2012 | Chamber for mixing gas from suspension furnance |
Cemex | 2012 | Demolishing permit project in Chełm II |
Lafarge Cement | 2012 | Modernization of fuels’ dosing installation in Małogoszcz Cement Plant |
Lafarge Cement | 2012 | Development of cement silos 2 x 500 m3 in Kujawy Cement Plant |
Warta Cement Plant | 2012 | Storage and transport of bypass dust in Warta Cement Plant |
Coking Plant “Przyjaźń | 2011/2012 | Modernisation of coke battery no 3 and 4 – coal route |
Górażdże Cement Plant | 2011/2012 | Terminal of bulk cement loading in Górażdże Cement Plant |
Warta Cement Plant | 2011 | Fly ash transport in Warta I |
Tauron/Energoprojekt Katowice | 2011 | Instalation of storage and transport of fly ash and sorbent in Bielsko Biała Power Plant |
Tauron/Instal | 2011 | Instalation of storage and transport of fly ash in Jaworzno Power Plant |
Warta Cement Plant | 2011 | System of fly ash dosing to cement mills no 4 ÷ 7 in Warta I |
Warta Cement Plant | 2011 | Instalation of by-pass dust transport and dosing |
Tauron | 2011 | Instalation of bottom and fly ash transport and storage in Jaworzno Power Plant |
Tauron | 2011 | Instalation of dust and sorbent transport and storage in Bielsko-Biała Power Plant |
Górażdże Cement Plant | 2011 | Installation of bulk cement loading in Górażdże Cement Plant |
Cemex Sp. Z o.o. | 2011 | Alternative fuel drying installation |
Ozarow Group S.A. | 2011 | Transport and storage of bypass dust in Ozarow Cement Plant |
MontoremSA | 2011 | Installation for burning of biological mass in Turow Power Plant |
Rafako S.A. | 2010 | Steel structures for installation of exhaust gas desulphurization – blocks 1 and 2 in Belchatow Power Plant (on course) |
Lahti Precision | 2010 | Glassworks in Iran and Brasil – Execution Documentation |
LAFARGE CEMENT S.A. Małogoszcz Cement Plant | 2010 | Fly ash transport and storage in Małogoszcz Cement Plant |
Warta S.A. | 2010 | Clinker silos of 120.000 m3 and 2 x 60.000 m3 – Conception Project |
Tribag | 2010 | Dehydration of dolomite deposites |
Drob - Bogs | 2010 | Poultry slaughter plant in Kaleń |
Ozarow Group S.A. | 2010 | Installation of alternative fuels |
Ozarow Group S.A. | 2010 | Installation of by-pass from furnace W1 |
Limestone Mine Czatkowice | 2010 | Modernisation of Sorting Department no 2 |
Rafako S.A. | 2010 | Modernisation of Electrofilter of block no 10 in Kozienice Power Plant |
Cemex Ltd. | 2009-2010 | Installation of Alternative Liquid Fuels (key-turn realisation) |
Lafarge Cement S.A. | 2009 | Installation of by-passs dust dosing in Kujawy Cement Plant |
Lafarge Cement S.A. | 2009 | Installation of pneumatic fly ash conveying in Kujawy Cement Plant |
Ozarow Group S.A. | 2009 | Nostrification of the MMP Ireland documentation for Raw Material Mill and Coal Mill in Ozarow Cement Plant |
Rafako S.A. | 2009 | Inlet and outlet flu gas ducts from hot gas precipitator in Boxberg Power Plant Germany. |
Vattenfall Polska S.A. | 2009 | Installation for burning biological mass in Siekierki Power Plant |
LAFARGE CEMENT S.A. Kujawy Cement Plant | 2008 | Pneumatic Cement transport line |
Carlsberg Poland S.A. | 2008 | Building permit changing project for fermentation tanks station in Okocim Brewery |
Cemex Ltd. | 2008 | Development of the second drying crusher |
Beton Bytom Ltd. | 2008 | Development of the industrial plant |
LAFARGE CEMENT S.A. Kujawy Cement Plant | 2008 | Cement packaging and paletization line |
Capital Investments’ Office | 2008 | Logistics Centre in Mielec |
Unitherm Cemcon | 2008 | Documentation of gas generators |
Cemex Ltd. Chełm Cement Plant | 2008 | Clinker silos of 2 x 125.000 tons with clinker transport to mill building |
Ożarów Group S.A. | 2008 | Clinker silo of 130 thousand tones with clinker transport to mill building |
LAFARGE CEMENT Kujawy Cement Plant | 2008 | Development of new cement mill |
Cemex Ltd. Chełm and Rudniki Cement Plants | 2008 | Geological and topographical documentation for future investments |
Cemex Ltd. | 2007 | Documentation of bulk cement loading station |
LAFARGE CEMENT Małogoszcz Cement Plant | 2007 | Building of by-pass ash silos and ash transport line |
Cemex Ltd. | 2007 | Installation of bulk cement loading |
Warta S.A. | 2007 | Ash silo of 3000 tons with pneumatic conveying |
LAFARGE CEMENT Kujawy and Małogoszcz Cement Plants | 2007 | Clinker silos of 120.00 tons |
Lafarge Cement S.A. Małogoszcz Cement Plant | 2007 | Installation of transportation and dosing of lime meal |
Górka Cement Ltd. | 2007 | Building Permit and Execution Project for Cement G40 new packing line in Górka Cement Plant |
Kęty Group S.A. | 2007 | Building Permit and Execution Project of printing cylinders assembly line |
Kęty Group S.A. | 2007 | Concept project of cargo gantry with infrastructure in Kęty Group - Building Permit and Execution Project |
Awbud S.A. | 2007 | Building Permit and Execution Project of the storage hall BODEKO in Zawiercie |
Cemex Ltd. | 2007 | Building Permit and Execution Project of alternative fuel installation in Chełm Cement Plant |
Alupol Ltd. | 2007 | Building of 7 – colour rotogravure printer. Building Permit and Execution Project |
Elwo S.A. | 2007 | Workshop drawings for new Electrostatic Precipitator Stambolijski in Bulgaria |
Rafako S.A. | 2006 | Building Permit and Execution Projects of flue gas desulphurization in Skawina Power Plant |
Górka Cement Ltd. | 2006 | Building Permit and Execution Project for TIR carpark and road modernization in Górka Cement Plant |
Kęty Group S.A. | 2006 | Technical documentation of overhauling of Transportation Workshop in Kęty Group |
Kęty Group S.A. | 2006 | Concept Project of road connection system in Kęty Group |
Lafarge Cement S.A. | 2006 | Building Permit and Execution Project of flue gas by-pass from rotary kiln in Kujawy and Małogoszcz Cement Plants |
Kęty Group S.A. | 2006 | Building Concept Project, Building Permit and Execution Project of halls with 11.000 m2 of social and office surface and 8.500 m2 of road connection system |
Philip Morris Poland S.A. | 2006 | Building Permit and Execution Project of thermal insulation of production halls |
Vistula S.A. | 2006 | Concept Project of new factory for Vistula Company |
Lafarge Cement Polska S.A. | 2006 | Fly ash silo 3000 t in Lafarge Kujawy Cement Plant |
MJM Ltd. | 2006 | Cement loading station project in Chelm Cement Plant |
Rafako S.A. | 2006 | Multitask project of Desulphurization Installation in Łodz Power Plant |
Carlsberg Poland | 2006 | Multitask concept project of road connection of Carlsberg Brewery with national domestic roads. |
Philip Morris Poland | 2006-2007 | Designing services for investments and overhauling |
Awbud Ltd. | 2005 | Building Permit and Multitask project for reinforcement steel production hall in CMC Zawiercie Ironworks. |
Lafarge Cement Polska. | 2005- 2006 | Modernization of raw materials dosing line in Malogoszcz Cement Plant (turn-key project). |
Carlsberg Poland | 2005 | Building Permit and Multitask project for fermentation tanks station in Okocim Brewery |
Coke Designing Office Koksoprojekt Ltd | 2005 | Workshop drawings for coke transport way to in Coke Plant Zdzieszowice |
Lurgi Bischoff | 2005 | Workshop drawings for Raw Mill ESP, Clinker Cooler ESP and Conditioning Tower in Cam Pha Vietnam Cement Plant |
Glass Works Krosno | 2005 | Multitask project for Storage Tanks Hall and raw materials dosing with building permit project |
Bolt Factory „Śrubex” S.A. | 2005 | Multitask project for bolt storage hall In Bolt Factory In Lancut |
Coke Designing Office Koksoprojekt Ltd | 2005 | Workshop drawings for coal transport way to Coal Tower 1008 M in Coking Plant in Zdzieszowice |
Elwo S.A. | 2005 | Workshop drawings of ESP and flue gas ducts in Tuzla Bosnia Power Plant |
"Korona" Ltd | 2005 | Feasibility study of energetic agents economy in Korona Ltd Factory |
Carlsberg Poland S.A. | 2005 | Multitask project of beer production hall in Okocim Brewery |
Lafarge Małogoszcz Cement Plant S.A. | 2005 | Modernization of KOCH pipe conveyor with belt replacing in Malogoszcz Cement Plant |
Elwo S.A. | 2005 | Workshop drawings of ESP in WSK Rzeszów Power Station |
Cement Plant Chełm | 2005 | Documentation for second stand of cement loading for tank car in Cement Plant Chelm |
Mittal Steel Poland Ltd | 2005 | Multitask project for modernization of solid waste storage with building permit project |
Cement Plant Chełm | 2004-2005 | Multitask project for petrochemical waste storage, handling and dosing |
Elwo S.A. | 2004 | Workshop drawings of ESP for SLECO Belgium Hot and cold roof Support structure for HV rectifiers. |
Ekocem Ltd | 2004 | Surface active components dosing system to cement mills in Ekocem Ltd. |
RMC Polska Ltd | 2004 | Sulphate transport line and dosing installation to cement packed into the paper bags in Rudniki Cement Plant. |
RMC Polska Ltd | 2004 | Sulphate transport line and dosing installation to cement packed into the paper bags in Chełm Cement Plant. |
Elwo S.A. | 2004 | Workshop drawings of Electrostatic Precipitator no 2 in Power Plant Tent-Obrenovac Serbia. |
WP Inwestment Ltd | 2004 | Multitask project of supermarket building with underground car parking in Krakow, Zakopianska street. |
Elwo S.A. | 2004 | Multitask project of dedusting installation from rotary kiln no 3 and 4 in “Górka Cement” in Trzebinia. |
Kimberly Clark S.A. | 2004 | HVAC project for paper machine no 3 building and paper storage building in Klucze Paper Plant. |
Górażdże Kruszywa Opolskie Kopalnie Surowców Mineralnych | 2004 | Multitask project of gravel mine “RUDA”. |
Chełm Bałtyk Cement | 2004 | Project of closed circuit kiln and cement mill cooling water |
Nordkalk Ltd | 2004 | Feasibility study modernization of Nordkalk Plant in Wolica. Modernization of railway station in Wolica. |
Elwo S.A. | 2004 | Workshop drawings of Electrostatic Precipitator no 5 in Power Plant Tent-Obrenovac Serbia. |
Górka Cement Ltd | 2004 | Civil engineering design and Workshop drawings for clinker handling from kiln no 3 and 4, clinker pouring junction, conveyor support steel structure. |
Alstom Power | 2004 | Workshop drawings for modernization of ESP no 5 in Kozienice Power Plant |
Lhoist Bukowa Ltd | 2004 | Pneumatic transport line of lime to silo no 4 (turn-key project). |
Elwo S.A. | 2004 | Workshop drawings of Electrostatic Precipitator and steel structures for Power Plant Pernik, Bulgaria. |
Górka Cement Ltd Trzebinia | 2004 | Multitask project for porter’s lodge, car parking, fence and main gate to Cement Plant. |
Górka Cement Ltd Trzebinia | 2003 | Modernization of cement G70 loading station. |
Elwo S.A. | 2003 | Workshop drawing of flue gas ducts, steel structures and stack for “Kuehlerenstaubung Sintranlage” Duisburg Germany. |
Ekocem Ltd | 2003 | Design and Workshop drawings of cement packing and palletizing line transfer from CSO to Ekocem. |
Eco – Invest Ltd | 2003 | Trzebinia Refinery Civil engineering for fuel organic components installation. |
Górka Cement Ltd Trzebinia | 2003 | Workshop drawings of Plant industrial water piping. Preliminary design and Workshop drawings for ash collection and handling from kiln exhaust gas chamber. Civil engineering design and Workshop drawings –“Modernization of clinker pouring junction”. Crushing machine development on clinker line to storage. |
UnitermCemcon Austria | 2003 | Workshop drawings for Hot Gas Generators No 1 & No 2 for Lafarge Beocin in Yugoslavia. |
Kimberly-Clark S.A. | 2003 | Multitask project for storage-production building 13.000 sq.m. in Klucze Paper Factory |
Power Plant in Legnica | 2003 | Workshop drawings for Electrostatic Precipitator – casing, roof, inlet & outlet nozzles, hoppers, stairs & platforms |
Power Plant in Kawęczyn | 2003 | Modernization of Electrostatic Precipitator – civil works |
Power Plant in WSK Rzeszów | 2003 | Modernisation of Electrostatic Precipitator – project of civil works, flue gas ducts. |
Lafarge Malogoszcz Cement Plant S.A. | 2003 | Multitask project for petrochemical waste storage, handling and dosing |
Boilers Factory Rafako S.A. | 2002 - 2003 | Engineering of 2 storage silos of 2100 m3 each, for Lodz Power Plant |
Lafarge Cement S.A. | 2002/2003 | Modernization of Cement Mills no 1 and 2 (turn-key project) |
Lafarge Cement S.A. | 2002 | Transport and dosing system of alternative fuels PASi and PASr (feeding to kiln 1 and 2) |
Alstom Power Sp. z o.o. | 2002 | Ash storage silo in IP Kwidzyn with a capacity of 2000 m3 |
Lafarge Cement Polska S.A. Cementownia Małogoszcz | 2001- 2002 | Modernization of the dedusting installation of kiln no. 1 and clinker cooler in Cementownia Małogoszcz |
Lafarge Cement Polska S.A. Kujawy | 2001 | New clinker production line with a capacity of 4,500 t/d in Bielawy - Preheater tower at the Lafarge Kujawy Cement Plant (the highest tower in Poland - 135 m) |
Nordkalk Miedzianka S.A. | 2001 | Modernization of the Plant Stage I: Screener replacement project |
Górażdże Cement S.A. | 2001 | Modernization of transport and dosing of ash to cement mill No. 1 in Górażdże Cement Plant |
Cementownia Lafarge Małogoszcz | 2000 | Intermediate tanks for additives for cement mills no. 3 and 4 in the "Małogoszcz" Cement Plant (capacity 2 x 100 m3) |
Huta im. Tadeusza Sendzimira | 2000 | Modernization of the dedusting installation for pig iron mixers no. 3 and 4 |
Echo Investment S.A. | 2000 | Shopping Center in Przemyśl and Świętochłowice |
Huta im. Tadeusza Sendzimira | 2000 | Modernization of the electrostatic precipitator for boiler no. 2 |
PSP Engineering a.s Prerov | 2000 | Modernisation of Cement Grinding Line No 3 at Lafarge Cement Plant . |
Lafarge Kujawy Cement Plant S.A. | 2000 | Modernisation of packing and palletising line. |
Lafarge Kujawy Cement Plant S.A. | 2000 | Feasibility study of cement transport modernisation: to the silo under the silo |
Lafarge Nida Gips | 2000 | Design of conveyor system for cardboard / gypsum plates |
Lafarge Małogoszcz Cement Plant S.A. | 1999 | Modernisation of preheater tower no 3 at Małogoszcz Cement Plant. |
P.P.U.B. „AREL-Gips” Bełchatów S.A. | 1998 - 1999 | Synthetic gypsum calcination installation, plaster mixture, repair gypsum and gypsum glue production |
Górażdże Cement S.A. | 1998 - 1999 | Rea- gypsum tanks – limestone transport. |
Nowiny Cement Plant | 1998 - 1999 | Modernisation of clinker transport from coolers. |
Limestone Mine „Czatkowice” Ltd. | 1998 - 1999 | Modernisation of Czatkowice Limestone Plant – objective: the reduction of noise emission. Solving the problem of dedusting at the crane – operated depot – modernisation of spraying system at discharge points. |
Lafarge Małogoszcz Cement Plant S.A. | 1999 | Modernisation of clinker transport system to the storage point in Małogoszcz Cement Plant. |
Rafako S.A. Steinmüller - Germany | 1997 | Siersza Power Plant – Flue Gas Desulphurisation (FGD): sorbent carrier and truck unloading station sorbent storage silo (2x1000 t) pneumatic handling of sorbent to the slurry preparation station |
Ożarów S.A. Cement Plant | 1997 | The increase of kiln W2 capacity to 3 800t/d. Rebuilding of homo silos. Placement of the “Gamma Metrics” analyser. |